Record any on-site supply redundancies that can provide energy or water if the primary supply is disrupted (e.g., a diesel generator backing up utility electric power). For each redundancy, note its start-up time, estimated runtime given the assets it supports and any stored or otherwise available resources, system reliability, and whether it is configured for automatic start in response to a disruption.
If two components operate in sequence (e.g., an uninterruptible power supply and a generator), enter them as a single supply redundancy (e.g., “UPS + generator”). Use the STIR’s Generator Runtime Calculator and Water Supply Runtime Calculator if you do not already know the estimated runtime.
Reliability
Is this supply redundancy equipment part of a preventive maintenance program?
Are written schedules and procedures in place and followed for the preventive maintenance and testing of the equipment?
Is there documentation of performance of preventive maintenance and testing, and documentation of observations associated with these activities?
Start-Up
Is the supply redundancy configured to automatically start upon disruption of the primary supplies?
If manual start-up of the redundant system is required, is it supported by written, up-to-date procedures, and are these procedures trained upon with documentation of completion of the training?
|
||||||
|
|