Development Server
Quick Resilience Assessment
(information is not permanently saved and will be cleared if the user logs out)
Risk Driver Summary
Select the number of risk drivers you would like to view.
Overview
Key Processes
Critical Assets
Hazards
Supply Chain

View a summary of which factors are driving risk at the site or see a breakdown of the top risk drivers at the site from multiple perspectives. For each subset, you can either view a summary of the data or a more detailed look at each risk driver type, including the associated supply type affected. Results are presented in terms of weighted risk. Weighted risk does not have units; rather it should be used as a tool to compare relative risk levels instead of evaluating the absolute values.

What characteristics of Hazards are driving risk?
Duration Electricity Natural Gas Water Asset Failure Supply Chain
< 8 hrs - - - - -
8 hrs to < 3 days 1,860.0 - - 1,050.0 -
3 days to < 2 weeks 111.1 - - - 217.5
2 weeks to < 2 months 49.8 0.6 3.3 1,056.8 255.3
2 months+ - - - 910.1 2,143.5
Weighted Risk by Category 2,020.9 0.6 3.3 3,016.9 2,616.3
Top risk drivers at your site include:
Key Processes Weighted Risk % of Total Weighted Risk
Metal Casting 4,342.2 56.7%
Refining 3,271.8 42.7%
Finishing 23.7 0.3%
- Other 20.4 0.3%
TOTAL KEY PROCESSES WEIGHTED RISK 7,658.0
Critical Assets Weighted Risk % of Total Weighted Risk
Grinder 1,951.3 38.7%
Induction Furnace 1,068.4 21.2%
Lathe 1,055.9 20.9%
- Other 966.2 19.2%
TOTAL CRITICAL ASSETS WEIGHTED RISK 5,041.7
Supply Chain Disruptions Weighted Risk % of Total Weighted Risk
Brass (zinc and copper ingots) 2,361.0 90.2%
Tumbling Rocks 255.0 9.7%
Wax 0.3 0.01%
TOTAL SUPPLY CHAIN DISRUPTIONS WEIGHTED RISK 2,616.3
Hazards Weighted Risk % of Total Weighted Risk
Hail 600.0 29.6%
Strong Wind 600.0 29.6%
Ice Storm 600.0 29.6%
- Other 224.8 11.1%
TOTAL HAZARDS WEIGHTED RISK 2,024.8
The top three Key Processes driving risk are:
Metal Casting; Refining; Finishing
Key Processes Weighted Risk % of Total Weighted Risk
Metal Casting 4,342.2 56.7%
Refining 3,271.8 42.7%
Finishing 23.7 0.3%
- Other 20.4 0.3%
TOTAL KEY PROCESSES WEIGHTED RISK 7,658.0
The top three Key Processes driving risk are:
Metal Casting; Refining; Finishing
Key Processes Electricity Natural Gas Water Asset Failure Supply Chain
Metal Casting 1,981.2 - - - 2,361.0
Refining 28.9 - - 2,987.9 255.0
Finishing 9.8 - 3.3 10.5 -
Weighted Risk by Category 2,019.9 - 3.3 2,998.4 2,616.0
The top three Critical Assets driving risk are:
Grinder; Induction Furnace; Lathe
Critical Assets Weighted Risk % of Total Weighted Risk
Grinder 1,951.3 38.7%
Induction Furnace 1,068.4 21.2%
Lathe 1,055.9 20.9%
- Other 966.2 19.2%
TOTAL CRITICAL ASSETS WEIGHTED RISK 5,041.7
The top three Critical Assets driving risk are:
Grinder; Induction Furnace; Lathe
Critical Assets Electricity Natural Gas Water Asset Failure
Grinder 9.6 - - 1,941.6
Induction Furnace 1,068.4 - - -
Lathe 9.6 - - 1,046.3
Weighted Risk by Category 1,087.7 - - 2,987.9
The top three Supply Chain driving risk are:
Brass (zinc and copper ingots); Tumbling Rocks; Wax
Supply Chain Weighted Risk % of Total Weighted Risk
Brass (zinc and copper ingots) 2,361.0 90.2%
Tumbling Rocks 255.0 9.7%
Wax 0.3 0.01%
TOTAL SUPPLY CHAIN WEIGHTED RISK 2,616.3

Critical Inputs 1 hour 1 day 1 week 1 month 6 months Total Weighted Risk
Brass (zinc and copper ingots) - - 217.5 - 2,143.5 2,361.0
Tumbling Rocks - - - 255.0 - 255.0
Wax - - - 0.3 - 0.3
Weighted Risk by Category - - 217.5 255.3 2,143.5 2,616.3
The top three Hazards driving risk are:
Hail; Strong Wind; Ice Storm
Hazards Weighted Risk % of Total Weighted Risk
Hail 600.0 29.6%
Strong Wind 600.0 29.6%
Ice Storm 600.0 29.6%
- Other 224.8 11.1%
TOTAL HAZARDS WEIGHTED RISK 2,024.8
The top three Hazards driving risk are:
Hail; Strong Wind; Ice Storm
Hazards Electricity Natural Gas Water
Hail 600.0 - -
Strong Wind 600.0 - -
Ice Storm 600.0 - -
Weighted Risk by Category 1,800.0 - -
Load Example Data
Clear STIR Data

Screening Tool for Industrial Resilience is a resource of the U.S. Department of Energy.

U.S. DOE Security & Privacy Accessibility Statement Freedom of Information Act (FOIA) Vulnerability Disclosure Policy USA.gov

THIS SITE IS ONLY FOR DEVELOPMENT AND INTERNAL TESTING

Official websites use .gov
A .gov website belongs to an official government organization in the United States.

Secure .gov websites use HTTPS
A lock ( ) or https:// means you’ve safely connected to the .gov website. Share sensitive information only on official, secure websites.